Skip to Content

Wave Planner — WP0001

Plan History

Plan sea shipments and truck batches from current data and AI. Save a draft, submit to Route / Load / QO, or abandon the plan.

Submitted plan WA: 1 Executed · 1 Provisional | WB: 6 Firm · 5 Proposed Read only

Cost estimate · based on the current WA/WB plan (read only, no scenario compare)

ObjectCost itemFormula (traceable)Subtotal
WA0002 Ocean freight + port rail 7 x (4,200 + 1,800) USD 42,000
WA0002 Regina destuffing 7 x 250 USD 1,750
WA0001 Ocean freight + port rail 8 x (4,200 + 1,800) USD 48,000
WB0004 Tour cost (SK-03) Demo rate · pending real carrier data Demo rate
WB0006 Tour cost (SK-01) Demo rate · pending real carrier data Demo rate
WB0002 Tour cost (SK-01) Demo rate · pending real carrier data Demo rate
WB0005 Tour cost (SK-02) Demo rate · pending real carrier data Demo rate
WB0003 Tour cost (SK-01) Demo rate · pending real carrier data Demo rate
WB0001 Tour cost (SK-02) Demo rate · pending real carrier data Demo rate
Position: scenario comparison is not part of the product. The engine evaluates alternatives internally and returns one recommendation plus a delta (the chips in the inbox). This page is the only place where cost is exposed, and every number traces back to a document constant (650/container/month, 250/container, 4,200 + 1,800 per container).
Discipline: tour cost is a demo rate until real carrier data is connected (design risk list item 6). Numbers that cannot be derived are not shown.